The upgrade was carried out in a close and trusting partnership between Humlum’s internal operations team and the automation specialists at Au2mate.
From the very start of the project, Au2mate prioritised a thorough pre-analysis and a structured migration plan that accounted for Humlum’s specific production conditions and the narrow windows in which the plant could stand still. Together, a clear strategy was developed for switchover, testing, and commissioning — with minimum risk and maximum operational reliability as the primary objectives.
Au2mate was responsible for technical implementation, documentation, test procedures (FAT/SAT), and training of Humlum’s operators and maintenance personnel. Emphasis was placed on transparency in design and knowledge transfer, so that Humlum can continue to work independently with the system and fully exploit the potential of the new platform.
The project was delivered on time and without any unplanned production stoppages. Throughout, the collaboration was characterised by open dialogue, flexibility, and a shared commitment to delivering a reliable and future-proof solution.
The outcome is a compelling example of how Humlum’s dedication and Au2mate’s technical expertise can combine in a partnership that delivers both measurable results and lasting value